Projects - Energy

Case study 1

Case Study 2

Case Study 3

Case Study 4

Energy from waste sites, power plants and electricity substations all have equally high demands for robust fire safe designs. In these often hazardous environments the safety of workers, site neighbours and accompanying commercial office spaces is paramount, as is the continuity of power generation.

At IFC we have a long standing track record working with the energy sector. Ensuring that our tailored advice is targeted to control the risk in these environments and give peace of mind to guarantee that sites can safely run.

Teesside Biomass Power Station
Sizewell
Dunbar Energy Recovery Facility
Cambridge Bio-Medical Campus Energy Centre
Cambridge EfW Plant
Cannington Court, EDF Energy
Huntstown Power Station

Battersea Power Station
EDF Transformer Stations
Wrexham Power Plant
Bridgewater EfW Plant
Drax Power Station
Wylfa Nuclear Power Station
Biomass Discover Park

Get in Touch
close slider
Please use this form to get in touch with us. If your enquiry is urgent please call +44 (0)1844 275500 and ask for someone in our team.
The information you provide will be stored and used by IFC Group for internal analysis purposes only and will not be passed onto any third parties. The information you provide is strictly for the purposes of helping IFC Group to assess and improve its services.
  • Drop files here or
      Please upload any documents you think will help us to provide an accurate quote. These can include drawings, scope or programmes.
    Scroll to Top